| |
 The 'BEFORE' pictures...
|
|

|
|

|
|

|
|

|
|
| |
 The crew has arrived...
|
|
 Setting up the equipment
|
|

|
|
 Stripping off the old shingles
|
|
 Covering the roof with new plywood
|
|
| |
 Starting to shingle...
|
|
 Putting on more plywood
|
|

|
|
 It snowed last night
|
|

|
|
| |
 The one side has been done
|
|
 Completing the other side
|
|
 Tarping it for the night
|
|

|
|
 The operations Manager
|
|
| |
 Rob is working too...
|
|
 Shingling the other side
|
|
 The new shingles look lovely!
|
|

|
|
 Some detail work up on the flat roof
|
|
| |
 Almost all covered with plywood
|
|

|
|
 Torching on the base sheet
|
|
 The lower flat roof
|
|
 View from above
|
|
| |
 The Manager is inspecting the work in progress
|
|
 Finishing up the second side...
|
|
 Working on the flat roof above
|
|
 It really needed new plywood!
|
|

|
|
| |
 Beautiful detail work!
|
|

|
|
 Almost all the cap sheet is on
|
|
 Detailing a skylight
|
|
 The base sheet and the drip-edges
|
|
| |
 Stripping the old shingles on the front roof section
|
|
 Nice job!
|
|

|
|

|
|
 The flat roof
|
|
| |
 Rolling out the cap sheet
|
|
 Details with the base sheet
|
|
 Nice detail work!
|
|
 Sealing the roof edge
|
|
 Working with a skylight
|
|
| |
 ...and the other skylight
|
|
 Detail work pieces
|
|

|
|
 This roof is almost done
|
|
 A happy All Pro roofer
|
|
| |
 The lower roof with the base sheet
|
|
 Detailing the base sheet
|
|
 Working on the front roof
|
|
 Great work done
|
|
 Professional work!
|
|
| |

|
|
 Well sealed roof!
|
|
 The front has just been done
|
|

|
|
 Installing some metal roof
|
|
| |

|
|
 And it's all completed
|
|
 Awesome roof
|
|
|
|
|
|