 Material is loaded on rooftop
|
|
 The "before" look
|
|
 Another angle...
|
|
 Another angle on the old roof
|
|
 Starting to tear it off...
|
|
| |
 ...and the core appears...
|
|
 Material sorting...
|
|
 The old insulation
|
|
 ...about 7,000 lbs off the roof
|
|
 Laying down the insulation
|
|
| |
 Sweeping the core clean
|
|
 Scraping off the old insulation
|
|
 Cutting up the new insulation
|
|
 That's looking good...
|
|
 Applying the 2nd layer of insulation
|
|
| |
 Putting down the Sopra-boards
|
|
 Increased fire-rating now!
|
|
 Fastening it down with 2" steel plates
|
|
 Cutting the Sopra-boards
|
|
 Wall-to-wall boarding...
|
|
| |
 Another 3,500 lbs of gravel is going off...
|
|
 There goes the gravel into the trailer...
|
|
 The base sheet is being torched on
|
|
 Starting to "water-tighten" it
|
|
 Priming up the edges...
|
|
| |
 Edge-detailing
|
|
 The new cone arond the soil stack
|
|
 Applying the primer
|
|
 A third of the roof is all water-tight!
|
|
 Installing more Sopra-boards
|
|
| |
 Everything is prepared...
|
|
 Cutting the boards
|
|
 Torching the base sheets
|
|
 More screws & plates
|
|
 Perfect fastening!
|
|
| |
 new curb surrounded by Sopra-boards
|
|
 Fastening it all...
|
|
 Flashing around the curb
|
|
 The curb is prepared...
|
|
 The last full roll of base sheet
|
|
| |
 Professional torching
|
|
 Detail trimming
|
|
 Almost all watertight
|
|
 The last detail at 10PM
|
|
 Our signature
|
|
| |
 Fastening on the edge flashing
|
|
 Very solid fastening!
|
|
 Looking perfect!
|
|
 Starting with the cap-sheet
|
|
 Our signature embedded in the roof
|
|
| |
 Detailing the curb with the cap sheet
|
|
 Further touches
|
|
 Experienced hands at work...
|
|

|
|

|
|
| |

|
|

|
|
 The curb is done
|
|
 Detailing by the A/C
|
|
 Roof corner detail
|
|
| |
 Parapet wall finish details
|
|

|
|
 Another parapet wall finish
|
|
 Another corner detail
|
|
 The roof has been completed
|
|
| |

|
|

|
|

|
|

|
|
 The soil stack cone is painted
|
|
| |

|
|

|
|
|
|
|
|
|
|